CDM F10 Notification Calculator

Simple sense-check for whether a construction project is notifiable under CDM 2015.
Project Inputs
Construction working days, not calendar days.
Highest number working simultaneously at any point.
Used only to estimate total person-days.
Working days
0
Max simultaneous workers
0
Estimated person-days
0

F10 NOT REQUIRED

The figures entered do not currently meet either CDM notification threshold.

How the Decision is Made
A project is notifiable if either of these tests is met:
✕Test 1: more than 30 working days and more than 20 workers working simultaneously at any point.
✕Test 2: more than 500 person-days of construction work.
Person-days: this calculator estimates person-days as working days × average workers per day. If the workforce changes significantly during the project, use a more accurate total rather than relying on a simple average.
Important: F10 notification is only one CDM duty. A project can still be subject to CDM requirements even where notification is not required.
Use as a sense-check: confirm the project details and dutyholder arrangements before relying on the result. Where a project is notifiable, the client has the notification duty under CDM 2015.
Thresholds checked against HSE CDM 2015 guidance.